    Concrete estimating guide

    Concrete is ordered by volume, in cubic yards for ready-mix or in bags that each make a known number of cubic feet. Getting the volume right means fewer half-empty bags and fewer emergency runs to the store before the pour sets.

    The formula

    Cubic feet = length (ft) × width (ft) × thickness (in) ÷ 12. Divide cubic feet by 27 to get cubic yards. The ÷ 12 turns inches into feet. Forgetting it is the most common reason an estimate comes out twelve times too big.

    Worked example: 10 × 10 ft patio, 4 in thick

    10 × 10 × 4 ÷ 12 = 33.3 cu ft. 33.3 ÷ 27 = 1.23 cubic yards. With the typical bag yields below that's 56 bags of 80 lb, 75 bags of 60 lb or 112 bags of 40 lb. With 10% extra for an uneven base and spillage it's 36.7 cu ft: 62 × 80 lb, 82 × 60 lb or 123 × 40 lb.

    Bag yields and bags per cubic yard

    BagTypical yieldBags per cubic yard
    80 lb≈ 0.60 cu ft45
    60 lb≈ 0.45 cu ft60
    40 lb≈ 0.30 cu ft90

    Yields vary a little by brand and mix, so check the yield printed on the bag you're buying.

    Footings and columns

    A footing is a long rectangle measured in feet along its length and inches across its width and depth: length (ft) × width (in) ÷ 12 × depth (in) ÷ 12. A 20 ft footing 12 in wide and 12 in deep is 20 cu ft, about 0.74 yd³. A round column or sonotube is π × (diameter in ÷ 24)² × height (ft). A 12 in tube 4 ft tall is 3.14 cu ft, which is 6 bags of 80 lb after rounding up.

    How thick should a slab be?

    4 in is a common thickness for patios, walkways and shed floors. Driveways and slabs that carry heavier loads are often 5–6 in, usually with reinforcement and a compacted base. Local code, soil conditions and your engineer or contractor decide what's right for a structural job. This calculator only does the volume math.

    Bags or ready-mix?

    Mixing by hand or in a small mixer is practical up to roughly a cubic yard. Past that, a ready-mix truck is usually faster and gives a more consistent pour. Ask local suppliers about minimum orders and short-load fees, then compare using the cost fields above.

    Planning checklist

    Common mistakes

    MistakeWhat happensFix
    Multiplying by inchesVolume 12× too highDivide thickness in inches by 12
    Forgetting ÷ 27Ordering cubic feet as yardsCubic feet ÷ 27 = cubic yards
    No extra for wasteRunning short mid-pourAdd 5–10%
    Rounding bags downA few bags shortAlways round up
    Ignoring a sloped baseThick spots use moreMeasure depth in several places and average

    More: bags of concrete for a 10×10 slab, concrete for fence posts, bags per cubic yard, gravel calculator for the base.

    How it works

    Slab: length (ft) × width (ft) × thickness (in) ÷ 12 = cubic feet. Footing: length (ft) × width (in) ÷ 12 × depth (in) ÷ 12. Column: π × (diameter in ÷ 24)² × height (ft). Multiply by quantity, add waste, then divide by 27 for cubic yards.

    Bag counts use typical premixed yields: 80 lb ≈ 0.60 ft³, 60 lb ≈ 0.45 ft³, 40 lb ≈ 0.30 ft³, rounded up. Check the yield printed on your brand's bag.

    FAQ

    How do I calculate cubic yards of concrete?

    Multiply length (ft) by width (ft) by thickness (in) divided by 12 to get cubic feet, then divide by 27. A 10 × 10 ft slab 4 in thick is 33.3 cu ft, or about 1.23 cubic yards.

    How many 80 lb bags of concrete do I need?

    An 80 lb bag of premixed concrete yields about 0.60 cu ft, a 60 lb bag about 0.45 cu ft and a 40 lb bag about 0.30 cu ft. Divide your total cubic feet by the yield and round up. A 10 × 10 ft, 4 in slab needs about 56 bags of 80 lb.

    How much extra concrete should I order?

    Most contractors add 5 to 10 percent for spillage, uneven subgrade and form bowing. Use the waste field to add it.

    Bags or ready-mix?

    Bags are practical for small jobs up to roughly 1 cubic yard. Above that, ready-mix delivery is usually cheaper and faster. Check your supplier's minimum order.

    Is a 4 inch slab thick enough?

    4 in is common for patios, walkways and shed floors. Driveways and heavier loads are often 5–6 in. Follow local code and your contractor for structural work.

    How many bags of concrete are in a yard?

    At typical yields, a cubic yard (27 cu ft) is 45 bags of 80 lb, 60 bags of 60 lb or 90 bags of 40 lb.